Categories: Alaska Weather

The massive project starts in 9 neighborhoods and will be completed entirely

The massive project starts in 9 neighborhoods and will be completed entirely

In Adana, ongoing works include the renovation of the drinking water pipeline covering 9 neighborhoods.

Adana Metropolitan Municipality Deputy Mayor Güngör Geçer stated that the aim of this project is to largely eliminate problems such as frequent water cuts and lack of water access to upper floors, especially during the summer months.

Geçer explained that teams inspecting the ongoing works in the Çamlıbel neighborhood have replaced the existing 700 mm pipes in the drinking water pipeline.

With a total pipeline replacement of 1300 meters, the infrastructure in the region will be strengthened and the water transmission capacity will be increased.

Upon completion of the project, the following neighborhoods will receive direct and uninterrupted drinking water:

Çamlıbel

Şehit Erkut Akbay

Yenidoğan

Levent

Güzelevler

İncirlik

Kozan

Yeşilbağlar

Alihocalı

Geçer also noted that the problem of low pressure, particularly in higher elevation areas, will be significantly resolved with this investment.

Alaska Movie

Recent Posts

The moment he opened his eyes, he found himself on a mountain

The moment he opened his eyes, he found himself on a mountain

1 week ago

The Heimlich maneuver saved another life

The Heimlich maneuver saved another life

1 week ago

The court halted the eviction of the hoarder’s house

The court halted the eviction of the hoarder's house

1 week ago

He collapsed to the floor from where he was sitting

He collapsed to the floor from where he was sitting

1 week ago

His son donated his kidney and he regained his health

His son donated his kidney and he regained his health

1 week ago

Women spend the most on cosmetics

Women spend the most on cosmetics

1 week ago

This website uses cookies.